Scope of Work:
- Design, Engineering, Supply of 1 X 970 kVA (MWM) + 3 X 1705 kVA (MWM) Gas Gensets based – Containerized Power Plant.
- Installation & Commissioning of the supplied Power Plant.
- Synchronization of all Gensets.
- Stepping up to 11 kV for Power Distribution.